Sign In Sign Up

FACTORY AUTOMATION & EQUIPMENT INSTALLATION

 

2019  ~ 2020

  • D1 / INTEL (Hillsboro, OR, USA): OHT Commissioning (2020)
  • L-3 / TI (Richardson, TX, USA): OHT Commissioning, TEL panel repair (2020)
  • D1 / INTEL (Hillsboro, OR, USA): Rail, HID, Equipment Installation Project Integration Mod2 & Mod1 (2019)
  • GIGAFACTORY / PANASONIC & TESLA (Reno, NV, USA): Equipment Commissioning, Configuration (2019)
  • D1 / INTEL (Hillsboro, OR, USA): Fire Door repairing, ILT installation Project (2019)
  • MSB / INTEL (Hillsboro, OR, USA): Rail, HID, Equipment Installation Project. Commissioning & maintenance of MTL, Firedoors upgrade (2019)
  • 3AFST13 / BOE (Hefei, Anhui, China): Equipment upgrading Installation Project. Stocker, AGV Port upgrade & Commissioning (2019)

2017 ~ 2018

  • D1X-MOD1 / INTEL (Hillsboro, OR, USA): Stocker Assembly & Upgrad, Cleanway integration (2018)
  • GIGAFACTORY / PANASONIC & TESLA (Reno, NV, USA): Equipment Commissioning, Configuration (2018)
  • MSB / INTEL (Hillsboro, OR, USA): Rail, HID, Equipment Installation Project, Commissioning & maintenance of MTL, Firedoors upgrade (2018)
  • D1D / INTEL (Hillsboro, OR, USA): Stocker, Port Modification & Installation Project  (2017)
  • D1X / INTEL (Hillsboro, OR, USA): Stocker Assembly, Replacement Project (2017)
  • D1X-MOD2 / INTEL (Hillsboro, OR, USA): Rail, HID, Equipment Installation Project  (2017)

2014 ~ 2016

  • D1D / INTEL (Hillsboro, OR, USA): Stocker Platform Installation (2016)
  • D1D / INTEL (Hillsboro, OR, USA): Port Modification Project (2016)
  • D1X-D1D / INTEL (Hillsboro, OR, USA): CLW Link Installation Project (2015)
  • F12 / SAMSUNG (Austin, TX, USA): N2 Purge System, Commissioning Service (2014)
  • AZFS / SAMSUNG (Austin, TX, USA): AZFS Installation Project (2014)

2012 ~ 2013

  • D1X PH-B / INTEL (Hillsboro, OR, USA): Stocker Installation Project  (2013)
  • PSP150 / SAMSUNG (Austin, TX, USA): Pre-maintenance pod, Stocker Installation Project (2013)
  • FOUP / INTEL (Hillsboro, OR, USA): FOUP Purge System, Commissioning Service (2013)
  • N2 / INTEL (Hillsboro, OR, USA): N2 Purge System, Commissioning Service (2013)
  • FOUP / INTEL (Hillsboro, OR, USA): FOUP, FOSB, Stocker Operation (2013)
  • EFEM / SAMSUNG (Austin, TX, USA): EFEM - Load port maintenance & Operation (2013)
  • PJT / SAMSUNG (Austin, TX, USA): ATLAS(PJT): Stocker, Rail, MIC Installation Project (2012)
  • M1 / SAMSUNG (Austin, TX, USA): ATLAS(M1): Rail Modification, Stocker Installation Project (2012)
  • UT / SAMSUNG (Austin, TX, USA): ATLAS(UT): Bay Modification / Rail Installation Project (2012)
  • D1X-PF / INTEL (Hillsboro, OR, USA): Stocker Platform Installation Project (2012)
  • FAB1, FAB2 / SAMSUNG (Austin, TX, USA):Pro-T  Phase 1 Project (2012)
  • S2BR / SAMSUNG (Austin, TX, USA):T-STAR-S2BR: Rail, Stocker Installation Project  (2012)
  • A2R / SAMSUNG (Austin, TX, USA):ATLAS-A2R: Rail, Stocker Installation Project (2012)
  • FABX / SAMSUNG (Austin, TX, USA):T-STAR-FABX: Rail, Stocker, MIC, E84 Installation Project (2012) 

2007 ~ 2011

  • D1D-S / INTEL (Hillsboro, OR, USA):Stocker Installation & Modification Project  (2011)
  • D1D-TP / INTEL (Hillsboro, OR, USA):Stocker Installation & Modification Project  (2011)
  • SAS-E84 / SAMSUNG (Austin, TX, USA):E84 kit Installation Project  (2010)
  • SATUM / SAMSUNG (Austin, TX, USA):Rail, Stocker, AZFS, MIC Installation Project (2010)
  • FAB1 / SAMSUNG (Austin, TX, USA):A2 EDS Phase1, Phase2 Projects (2010) 
  • FAB1 / SAMSUNG (Austin, TX, USA): T-Project: Rails, Stockers, AZFS Installation (2009)
  • A2-EDS / HYNIX (Eugen, OR, USA): HYNIX / DIAMOND OHT Installation Project (2008)
  • A2-300 / SAMSUNG (Austin, TX, USA): OHT(Square), OHS, Stocker Installation Project (2007)